Every contract in the company profile, 44 in total, running from 2007 to 2024. Project titles, clients and scopes are based on the supplied Arthur Ferdinand Company Profile V3 and the previously published project record.

Complete contract list

Projects handled by Arthur Ferdinand Limited, 2007–2024. Client names and project scopes are reproduced from the supplied profile and project record; some work was delivered alongside named EPC contractors.
Project Client Discipline Date Status
Supply and Installation of 300KVA 33/0.400 Transformer at AFL Fabrication Yard Arthur Ferdinand Limited Electrical Infrastructure March 2024 Completed
Extension of 33KVA High Tension Lines from Mosogar to Okueka Communities Seplat Energy Electrical Infrastructure November 2024 Ongoing
Replacement, Supply and Installation of 200KVA 33/0.400 Transformer at No. Onoka Close, Ekpan Landlord Association, No. Onoka Close, Ekpan Electrical Infrastructure January 2023 Completed
Procurement, Construction, Installation and Commissioning of 750KVA 33/0.400 Transformer and 3KM High Voltage Line at Amity Farms Amity Global Farm Services Electrical Infrastructure July 2023 Completed
Project Management Office Security/Surveillance of Pipeline in Western, Central and Eastern Corridor Inter-Atlas Synergy Ltd, NNPCL Surveillance & Security AUGUST 9, 2023 Ongoing
Laying of 18-inch x 8KM and 12-inch x Approx. 2KM Natural Gas Pipeline Along Lagos-Ibadan Expressway Enikkom Construction Ltd / NIPCO Gas Limited Pipeline Construction November 2022 Completed
Replacement of Bad 24” Valve at Oben Node Aghara AGI PS 1 Escravos – Lagos Gas Pipeline Nigeria Gas Company (NGC) / Zakhem Pipeline & Valves JANUARY 2020 Completed
Construction of Drainage System at Onoka Street, Warri Uvwie Local Government Civil Works April 2020 Completed
Escravos Gas Pipeline 36-inch Civil Work at Oben Node Oghara – AGI PS 1 Nigeria Gas Company (NGC) / Zakhem Civil Works January 2020 Completed
Expansion of Warri Gas Treatment Plant Nigeria Gas Company (NGC) / Zakhem Other Works November 2019 Ongoing
Leak Repair of 36″ Escravos – Lagos Gas Pipeline Nigeria Gas Company (NGC) / Zakhem Pipeline & Valves November 2019 Completed
Supply of Processing Equipment Spare Parts for Oredo Early Production Facility (epf2) at Oredo Flowstation in OML 111 Nigerian Petroleum Development Company Limited (NPDC) Gas Plants & Facilities MAY 2019 Completed
Surveillance, Security, Maintenance and Repairs of Trans Forcados Pipeline NPDC / OMS Surveillance & Security APRIL 2019 Ongoing
Surveillance, Security, Maintenance and Repairs of OML 40 Pipeline NPDC / OMS Surveillance & Security 2018 Ongoing
Surveillance, Security, Maintenance and Repairs of NCTL Aiteo E&P Surveillance & Security NOVEMBER 2017 Completed
Repair of Crude Oil Storage Tank 81 Warri Refining & Petrochemical Limited Refinery & Tankage MAY 2017 Completed
Repair of Crude Oil Storage Tank 63 Warri Refining & Petrochemical Limited Refinery & Tankage MAY 2017 Completed
Emergency Construction of 20″ by 8km Crude Oil Pipeline from Jetty to WRPC Tank Farm WRPC Pipeline & Valves FEBRUARY 2016 Ongoing (90% complete)
Expansion of Escravos Lagos Gas Pipeline Project – Phase 2 (fabrication / Installation of AGI/ 36″ LBV) NNPC Pipeline & Valves JANUAR Y 2015 Completed
Expansion of Escravos Lagos Gas Pipeline Project – Phase 2 (fabrication / Installation of Two 36″ LBV ) NNPC/ Zakhem Pipeline & Valves JANUAR Y 2015 Completed
Expansion of Escravos Lagos Gas Pipeline Project – Phase 2 (ikpeba.8km 36″ River Crossing / Swamp) NNPC Pipeline & Valves JANUAR Y 2015 Completed
Expansion of Escravos Lagos Gas Pipeline Project – Phase 2 (ologbo /Oghara 4.8km 36″ River Crossing / Swamp) NNPC / Zakhem Pipeline & Valves JANUARY 2015 Completed
Expansion of Escravos Lagos Gas Pipeline Project- Phase 2 (hydro Texting of 36″, 51km from Pko to Kp51) NGC Pipeline & Valves NOVEMBER 2015 Completed
Repair of Crude Oil Storage Tank 60 Warri Refining & Petrochemical Limited Refinery & Tankage OCTOBER 2014 Completed
Expansion of Escravos Lagos Gas Pipeline Project – Phase 2 (36″ 70 KM) NNPC / Zakhem Pipeline & Valves NOVEMBER 2014 Completed
Edo Gas Development Project Nigeria Gas Company (NGC) Other Works JUNE 2014 Completed
Expansion of Escravos Lagos Gas Pipeline Project – Phase 2 (30″ /36″ ) Hot Tapping NNPC / Zakhem Pipeline & Valves MARCH 2013 Completed
Expansion of Escravos Lagos Gas Pipeline Project- Phase 2 (oregha 30″ River Crossing / Swamp) NNPC / Zakhem Pipeline & Valves JANUARY 2011 Completed
Expansion of Escravos Lagos Gas Pipeline Project- Phase 1 (24″ NGC – WGTP Station Approach) N.G.C. / Zakhem Pipeline & Valves SEPTEMBER 2011 Completed
Expansion of Escravos Lagos Gas Pipeline Project – Phase 1 (30″ NGC – WGTP Station Approach) N.G.C. / Zakhem Pipeline & Valves SEPTEMBER 2011 Active
Escravos Gas Project Phase 3 – (fabrication / Blasting and Painting of Module 65) Chevron / HHI Fabrication & Coatings APRIL 2010 Completed
Escravos Gas Project Phase 3 – Fabrication, Blasting and Painting of Module 66 Chevron / HHI Fabrication & Coatings April 2010 Completed
Escravos Gas Project Phase 3 – Fabrication, Blasting and Painting of Module 67 Chevron / HHI Fabrication & Coatings April 2010 Completed
Modification of 3” PC C3 Return Line to Tank Farm Warri Refining and Petrochemical Refinery & Tankage FEBRUARY 2009 Active
Repair of 24″ Pipe Near Gas Tank Farm Warri Refining and Petrochemical Refinery & Tankage JANUARY 2008 Active
Repair of 24” Kero Pipe at Jetty Warri Refining and Petrochemical Refinery & Tankage MAY 2008 Active
Repair of FCC Debutanizer Column (16- )-06) in Fuel Plant Warri Refinery and Petrochemical Refinery & Tankage OCTOBER 2008 Active
Repair of Loading Arms (hot Tapping) Warri Refining and Petrochemical Pipeline & Valves JANUARY 2008 Active
Piping of Waste Water Plant Warri Refining and Petrochemical Refinery & Tankage FEB 2008 Active
Nitrogen Purging Chevron Gas Plant HHI EGP3 Project Pipeline & Valves JAN 2008 Active
Emergency Linking of PC Wells (wells Abc) to D951/Fire Water Tank Warri Refining and Petrochemical Refinery & Tankage JANUARY 2008 Active
Rehabilitation of Olo, Ogini, Olomoro Flow Station and Pipeline SPDC / Lee Engineering Plant & Pipeline Rehabilitation Completed
Construction of a Jump-Over Line from Fuel Oil to the Condensate Line for the Transfer of Light Slop Oil from 301-Tk-35/36 to the Crude Tanks Warri Refining and Petrochemical Refinery & Tankage DECEMBER 2007 Active
Instrumentation Work at Alakiri Gas Plant SPDC / Lee Engineering Gas Plants & Facilities Active

Some pages of the source document listed more than one contract; where two entries carried an identical title and client they have been merged. Typos in the source document (for example "TREAMENT", "RIPAIR", "COLUM") have been corrected in the titles above.

Need an engineering, maintenance or field-services partner?

Send the scope, location, drawings and operating constraints. Our team will review the requirement and respond with the information needed for a technical and commercial proposal.

WhatsApp Request a quote